1. Waterproofing is generally applied after the building is formed. Foreign matter such as floating dust and oil on the surface of the substrate must be removed, and defects must be repaired.
2. The substrate should be fully dried for the best effect.
3. Mix this product with appropriate diluents and additives in a predetermined ratio and seal it for use. Please comply with local safety regulations when using diluents.
4. Before large-scale construction, be sure to conduct a small-area test.
5. Apply the waterproofing agent to the surface of the substrate by brush, roller or spray to fully wet and absorb the surface of the substrate.
6. After brushing, cure at room temperature for more than 48 hours. The substrate is prohibited from contacting water before the protective effect is produced. The curing time depends on the amount of paint used and the ambient temperature.
Disclaimer: The data in this document is provided based on our knowledge and necessary tests. The product can meet all the requirements mentioned in the document under appropriate conditions of use. We cannot guarantee the data and performance of the product under changing actual conditions. We recommend that users conduct necessary tests in their own laboratories or fields to evaluate whether the product meets all requirements.